Groundworks

Clearing a way for the right foundations

The goal is to ensure that we remove all the contamination that may prove hazardous. Ensuring compliance with waste management and in conjunction with scientific evidence.

Key components of groundworks:

01.
Site Preparation

This may include removing vegetation, topsoil, old foundations, or debris. We use a construction phase plan to mitigate risk identify hazards in conjunction with a planned programme of works, with specialised equipment to ensure safe and efficient tasks to be completed.

02.
Excavation

Excavation is one of the most significant stages. It involves digging and safely removing contaminated soils that have been tested for levels and type of contamination, this maybe completed by hand or via specialised equipment

03.
Replacement service installation

During the groundwork stage, we may often need to replace Oil lines from boilers to oil storage tanks, Water mains or associated services such as, electricity conduits, or communication cables.

04.
Reinstatement

Careful consideration to reinstate any area back to pre loss state, using materials and products that are both effective and atheistically pleasing, with planned stage of works to minimimse disruption to homeowners and tenants.

Ready to get us involved?
GET IN TOUCH
Thank you for making the whole experience as trouble and stress free as possible. I noticed how tidy they left the garden shed …. That showed a very thoughtful attitude!
Phyllis
Location
Steve and his team have been amazing. A great standard of work with as little disruption as possible
Mr Barton
Location
Not only was everything  done to a high standard but also with courtesy and consideration.  I just wanted you to know that your team are undoubtedly great ambassadors for Trinity.
John
Location
We are both really pleased with Trinity Environmental, the entire team were very efficient, professional, friendly, respectful and hardworking, we would recommendthem to anyone who needs their services
Mrs Williams
Location